Water Works Sidewalk Gap – Various Locations 452877-1-52-01
Project Details
Work Type | Pedestrian Improvements |
---|---|
Phase | Construction |
Limits | Doyle Carlton Dr to east of Tampa Street |
Project Start | Late 2024 |
Length | 0.5 Mile |
City | |
County | |
Road | |
Construction Cost | $1.1 million |
Estimated Completion | Fall 2025 |
Contractor | Blacktip Services, Inc. |
About
The Water Works Sidewalk Gap project will enhance multi-modal connectivity by eliminating key sidewalk gaps within the Tampa Heights district along I-275 near Water Works Park.
A direct wide sidewalk connection from Doyle Carlton Drive to east of Tampa Street (adjacent to the barrier-separated I-275 exit ramp) and a pedestrian crossing at Doyle Carlton Pedestrian Drive south of I-275 will be added.
Construction is anticipated to begin in late 2024.
View Factsheet
Contact Information
Project Information |
---|
Maricelle Venegas
813-975-6204
Maricelle.Venegas@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
|
Closures
- There are no closures at this time.