-
CR 39 Closed to the south of SR 60 in Plant City
At 12:15 a.m. on Saturday, October 18, the Florida Department of Transportation’s contractor closed C.R. 39 to the south of S.R. 60 in Plant City.
During the closure, drivers must detour around the work zone using Lithia Pinecrest Road or Highway 37. This section of C.R. 39 is expected to remain closed for approximately 14 days, weather permitting.
For more information on the SR 60 reconstruction project or to sign up for traffic alerts, visit FDOTTampaBay.com.
-
CR 39 Closing to the south of SR 60 in Plant City
Plant City, FL – Beginning at 12:01 a.m. on Saturday, October 18, the Florida Department of Transportation’s contractor will close C.R. 39 to the south of S.R. 60 in Plant City. Click to view DETOUR MAP
During the closure, drivers must detour around the work zone using Lithia Pinecrest Road or Highway 37. This section of C.R. 39 is expected to remain closed for approximately 14 days, weather permitting.
Drivers may experience traffic delays and congestion on all nearby roads as crews build the new concrete travel lanes on C.R. 39, just south of S.R. 60. Eastbound/westbound S.R. 60, along with S.R. 39 to the north of the intersection, will remain open to traffic during this phase of construction.
Message boards and signage will assist drivers traveling through the area. Motorists are reminded to slow down, stay alert, and drive safely through the work zone.
This project is resurfacing SR 60 from SR 39 to Clarence Gordon Jr. Road, replacing the asphalt pavement with concrete at the intersection of SR 39, and modifying the median openings on SR 60 to the east and west of SR 39 in Hillsborough County. Construction activities are expected to be completed by the fall of 2026.
For more information on the SR 60 reconstruction project or to sign up for traffic alerts, visit FDOTTampaBay.com.
-
Nighttime Ramp Closures Continue from Tampa Airport and Spruce Street to WB SR 60 and NB SR 589
Temporary nighttime ramp closures from Tampa International Airport and Spruce Street to westbound SR 60 (Memorial Highway) and northbound SR 589 (Veterans Expressway) continue from 11 p.m. to 5 a.m., Sunday through Thursday (10/5-10/9, 10/12-10/16, 10/19-10/23, and 10/26-10/30), weather permitting.
Motorists exiting Tampa International Airport will use the Spruce Street ramp (stay right at the fork), continue eastbound on Spruce Street, turn right onto Westshore Boulevard, turn right onto Kennedy Boulevard, and proceed north toward SR 60 (Memorial Highway) and SR 589 (Veterans Expressway) ramps.
Motorists traveling westbound on Spruce Street will detour around the work zone using Westshore Boulevard and Kennedy Boulevard to access SR 60 (Memorial Highway) and SR 589 (Veterans Expressway).
Advanced warning signs and electronic message boards will assist vehicles traveling through the area. Motorists should use caution when traveling through the work zone and remain alert for construction workers.
These temporary ramp closures are necessary for crews to perform final paving operations as part of the widening of westbound SR 60 near the Tampa International Airport. For more information on this project, please visit FDOTTampaBay.com.