S Dale Mabry Hwy (US 92) Resurfacing From North of Ballast Point to South of Sevilla St 443781-1
Project Details
Work Type | Resurfacing |
---|---|
Phase | Design |
Limits | US 92 / SR 600 / S Dale Mabry Hwy from north of Ballast Point to south of Sevilla St |
Length | 1.55 Miles |
City | |
County | |
Road | |
Design Cost | $935,000 |
About
The Florida Department of Transportation (FDOT), District Seven, invites you to attend and participate in a Public Meeting for the proposed median modifications on S. Dale Mabry Hwy (US 92) at Kensington Avenue and S. Dale Mabry Hwy (US 92) from Fair Oaks Avenue to Lawn Avenue, Tampa, Hillsborough County, Florida. The public meeting will be held on Tuesday, May 14, 2024 from 4:30 to 6 p.m. at the Jan Kaminis Platt Regional Library, 910 S Manhattan Ave, Tampa, FL 33611.
As part of a resurfacing project on US 92 from Ballast Point Road to Sevilla Street, FDOT is proposing median modifications on US 92 at Kensington Avenue by adding a permanent directional median opening and permanent traffic separator along the left turn lane to El Prado Boulevard.
The Department is also proposing to add a permanent raised traffic separator to define the median between Fair Oaks Avenue and Lawn Avenue while maintaining current movements at both side streets.
The project is currently in the design phase. Construction is anticipated to begin in 2025.
Contact Information
Design Manager |
---|
Liyanage Ratnayake
813-361-6889
Liyanage.Ratnayake@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
|
Closures
- There are no closures at this time.